Troy - 1st time on long lead playing fetch
2 posters
Staffordshire bull terrier :: Your Staffordshire Bull Terrier Photos, Videos And Introductions Area :: Staffordshire Bull Terrier Video Corner
Page 1 of 1
Troy - 1st time on long lead playing fetch
Rescued Troy 4 weeks ago. Has some issues with socialisation with other dogs but that's another story!
I was not sure how he would be off the lead so bought a long lead of Ebay. This is the first time I have used it and his recall seems very good. Even when walking around he stops and looks back at me to see where I am and doesn't appear to want to go very far away from me. When I call him back he mostly comes straight away, which is great. When he see's another dog that's a different story though.
Here is the small video:
Click here for video
I was not sure how he would be off the lead so bought a long lead of Ebay. This is the first time I have used it and his recall seems very good. Even when walking around he stops and looks back at me to see where I am and doesn't appear to want to go very far away from me. When I call him back he mostly comes straight away, which is great. When he see's another dog that's a different story though.
Here is the small video:
Click here for video
Gee- Staffy-Bull-Terrier VIP Member
- Status :
Online Offline
Location : Huddersfield
Join date : 2012-01-25
Support total : 34
Posts : 728
Re: Troy - 1st time on long lead playing fetch
Thanks.
Not well trained when I got him and still got some way to go. Only taught him fetch and drop yesterday in the living room.
Not well trained when I got him and still got some way to go. Only taught him fetch and drop yesterday in the living room.
Gee- Staffy-Bull-Terrier VIP Member
- Status :
Online Offline
Location : Huddersfield
Join date : 2012-01-25
Support total : 34
Posts : 728
Re: Troy - 1st time on long lead playing fetch
aw lovely video - well done you and Troy deserves a star
Guest- Guest
Re: Troy - 1st time on long lead playing fetch
good work lil' Troy's coming along nicely. keep up the good work
Guest- Guest
Re: Troy - 1st time on long lead playing fetch
Well done to you and Troy, nice video
roxyrocket- Staffy-Bull-Terrier VIP Member
- Status :
Online Offline
Location : Birmingham
Dogs Name(s) : Roxy
Dog Gender(s) : Female
Join date : 2011-05-08
Support total : 27
Posts : 892
Re: Troy - 1st time on long lead playing fetch
Thanks.
Went back out with him on the long lead but never had hold of it, so he was basically just running around as if he was off the lead.
Only problem with the long lead is, he saw someone on a bike and bolted towards them, not aggressively, I think he is just intrigued by bikes...his recall is good but not when something has his attention. I had to grab the long lead and because he had built up some speed he ended up doing a somersault once the tension hit! I don't want to end up damaging his neck!
Went back out with him on the long lead but never had hold of it, so he was basically just running around as if he was off the lead.
Only problem with the long lead is, he saw someone on a bike and bolted towards them, not aggressively, I think he is just intrigued by bikes...his recall is good but not when something has his attention. I had to grab the long lead and because he had built up some speed he ended up doing a somersault once the tension hit! I don't want to end up damaging his neck!
Gee- Staffy-Bull-Terrier VIP Member
- Status :
Online Offline
Location : Huddersfield
Join date : 2012-01-25
Support total : 34
Posts : 728
Re: Troy - 1st time on long lead playing fetch
That was really good, he's coming on well.
Don't worry too much about hurting him with the line (that sounds really nasty, doesn't it?), he should remember that next time & will hopefully slow down at least when you call!
What I used to do with Dempsey is shout "Steady!" & for some reason that slowed him up.
Don't worry too much about hurting him with the line (that sounds really nasty, doesn't it?), he should remember that next time & will hopefully slow down at least when you call!
What I used to do with Dempsey is shout "Steady!" & for some reason that slowed him up.
Guest- Guest
Re: Troy - 1st time on long lead playing fetch
I am impressed...Troy is doing well... 4 weeks isn't long to have owned him, he is doing great..and so are you!
Guest- Guest
Re: Troy - 1st time on long lead playing fetch
Thanks for the tips and comments.
I actually have him running around and playing fetch without holding the long line. It's only if he's sees another dog or something that interests him when I have to grab it.
I actually have him running around and playing fetch without holding the long line. It's only if he's sees another dog or something that interests him when I have to grab it.
Gee- Staffy-Bull-Terrier VIP Member
- Status :
Online Offline
Location : Huddersfield
Join date : 2012-01-25
Support total : 34
Posts : 728
Re: Troy - 1st time on long lead playing fetch
lil' Troy's blessed to have the life he has now
Guest- Guest
Re: Troy - 1st time on long lead playing fetch
Thanks!
I took him to a different park today on his long lead and there were occassions where he would listen and come back to me, but other times where he would of trotted off if he wasn't on the lead.
I took him to a different park today on his long lead and there were occassions where he would listen and come back to me, but other times where he would of trotted off if he wasn't on the lead.
Gee- Staffy-Bull-Terrier VIP Member
- Status :
Online Offline
Location : Huddersfield
Join date : 2012-01-25
Support total : 34
Posts : 728
Re: Troy - 1st time on long lead playing fetch
Troy looks like he is coming along famously. Kudos
Guest- Guest
Re: Troy - 1st time on long lead playing fetch
thats a nice big lead where do you get them. looks like someone is having fun with some freedom
Guest- Guest
Re: Troy - 1st time on long lead playing fetch
Thanks.
I actually just let it hang and throw the ball so far that he is basically off the lead. I leave it on for the times he gets distracted or see's another dog and I have to grab it.
And I got mine from Ebay:
Click here for long lead
I actually just let it hang and throw the ball so far that he is basically off the lead. I leave it on for the times he gets distracted or see's another dog and I have to grab it.
And I got mine from Ebay:
Click here for long lead
Gee- Staffy-Bull-Terrier VIP Member
- Status :
Online Offline
Location : Huddersfield
Join date : 2012-01-25
Support total : 34
Posts : 728
Re: Troy - 1st time on long lead playing fetch
thanks for that. we have the retractable ones but theyre only 16 feet never seen one this big before and theyre cheap enough too will have to get 2 well i will get 3 cos my sister could do with one for sonic the grey hound too
Guest- Guest
Re: Troy - 1st time on long lead playing fetch
Yeah they are nice and cheap. Not had any problems with the strength either. Troy had a little 'trot' towards another dog but didn't come back unfortunately, therefore once he came to the end of the lead he ended up doing a somersault backwards in the air.
Gee- Staffy-Bull-Terrier VIP Member
- Status :
Online Offline
Location : Huddersfield
Join date : 2012-01-25
Support total : 34
Posts : 728
Re: Troy - 1st time on long lead playing fetch
Gee wrote:Yeah they are nice and cheap. Not had any problems with the strength either. Troy had a little 'trot' towards another dog but didn't come back unfortunately, therefore once he came to the end of the lead he ended up doing a somersault backwards in the air.
poor troy
Guest- Guest
Re: Troy - 1st time on long lead playing fetch
well done you and Troy your hard work is really paying off
Guest- Guest
Similar topics
» Alfie playing on his long lead
» Funny vid of Holly and Dan playing fetch
» PLAYING FETCH
» Playing Fetch
» tyke playing fetch
» Funny vid of Holly and Dan playing fetch
» PLAYING FETCH
» Playing Fetch
» tyke playing fetch
Staffordshire bull terrier :: Your Staffordshire Bull Terrier Photos, Videos And Introductions Area :: Staffordshire Bull Terrier Video Corner
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|